EnglishFrenchSpanish

OnWorks favicon

Resource Leveling Module for dotProject download for Linux

Free download Resource Leveling Module for dotProject Linux app to run online in Ubuntu online, Fedora online or Debian online

This is the Linux app named Resource Leveling Module for dotProject whose latest release can be downloaded as dpResourceLeveling-1.0.5.zip. It can be run online in the free hosting provider OnWorks for workstations.

Download and run online this app named Resource Leveling Module for dotProject with OnWorks for free.

Follow these instructions in order to run this app:

- 1. Downloaded this application in your PC.

- 2. Enter in our file manager https://www.onworks.net/myfiles.php?username=XXXXX with the username that you want.

- 3. Upload this application in such filemanager.

- 4. Start the OnWorks Linux online or Windows online emulator or MACOS online emulator from this website.

- 5. From the OnWorks Linux OS you have just started, goto our file manager https://www.onworks.net/myfiles.php?username=XXXXX with the username that you want.

- 6. Download the application, install it and run it.

SCREENSHOTS

Ad


Resource Leveling Module for dotProject


DESCRIPTION

A simple resource leveling module for dotProject (www.dotproject.net). It is intended to fill the lack of this functionality in version 2.x of the software.



Audience

Information Technology



Programming Language

PHP


Categories

Project Management

This is an application that can also be fetched from https://sourceforge.net/projects/dpresourcelevel/. It has been hosted in OnWorks in order to be run online in an easiest way from one of our free Operative Systems.


Free Servers & Workstations

Download Windows & Linux apps

  • 1
    XMLTV
    XMLTV
    XMLTV is a set of programs to process
    TV (tvguide) listings and help manage
    your TV viewing, storing listings in an
    XML-based format. There are utilities to
    do...
    Download XMLTV
  • 2
    strikr
    strikr
    Strikr Free Software project. Artifacts
    released under a 'intent based'
    dual license: AGPLv3 (community) and
    CC-BY-NC-ND 4.0 international
    (commercial)...
    Download strikr
  • 4
    GIFLIB
    GIFLIB
    giflib is a library for reading and
    writing gif images. It is API and ABI
    compatible with libungif which was in
    wide use while the LZW compression
    algorithm was...
    Download GIFLIB
  • 5
    Alt-F
    Alt-F
    Alt-F provides a free and open source
    alternative firmware for the DLINK
    DNS-320/320L/321/323/325/327L and
    DNR-322L. Alt-F has Samba and NFS;
    supports ext2/3/4...
    Download Alt-F
  • 6
    usm
    usm
    Usm is a unified slackware package
    manager that handles automatic
    dependency resolution. It unifies
    various package repositories including
    slackware, slacky, p...
    Download usm
  • More »

Linux commands

Ad